R&D - Industrial
1. | Pyrolyx Invent GmbH (Germany) - Application trials of pyrolitic carbon blacks and oils produced by Pyrolyx Invent GmbH in different rubber mixes |
| Running time: 2014-2015 |
| Project manager: Dr. Karger-Kocsis József |
2. | Nanotechnology Center of Composites (Russia) - Sample Manufacturing and Testing for Development Project The Recycled Ground Rubber Road Slab Development |
| Running time: 2013 |
| Project manager: Dr. Karger-Kocsis József |
3. | CellCall Kft. - Development of a sample holder device used in human diagnostics |
| Running time: 2013-2015 |
| Project manager: Dr. Kovács József Gábor |
4. | TIGÁZ-DSO Földgázelosztó Kft. - Investigation of the effect of operating conditions on the lifetime and sealing capability of nipple and rimmed couplings of gas pipelines |
| Running time: 2012-2013 |
| Project manager: Dr. Gaál János |
5. | Nanotechnology Center of Composites (Russia) - Production and Properties of Road Mats Composed of Ground Tyre Rubber (GTR) and Thermosetting Polymers |
| Running time: 2012 |
| Project manager: Dr. Karger-Kocsis József |
6. | Nanotechnology Center of Composites (Russia) - Production and Properties of Slabs from Ground Tyre Rubber (GTR) and Moisture-Curable Polyurethane. Effects of Polyisocyanates and their Amounts; Processing Time, Temperature and Pressure |
| Running time: 2012-2013 |
| Project manager: Dr. Karger-Kocsis József |
7. | Phoenix Mecano Kecskemét Kft. - Experimental analysis of the relaxation of injection molded products |
| Running time: 2011 |
| Project manager: Dr. Kovács József Gábor |
8. | Batex Bt. - Chromogenic polymers and dyes |
| Running time: 2011 |
| Project manager: Dr. Czigány Tibor |
9. | Jász-Plasztik Kft. - Development of the raw material for battery housings which fully satisfy the requirements of the leading car manufacturers |
| Running time: 2011 |
| Project manager: Dr. Kovács József Gábor |
10. | Jász-Plasztik Kft. - Upcycling of recollected PET bottles |
| Running time: 2011 |
| Project manager: Dr. Ronkay Ferenc György |
11. | Jász-Plasztik Kft. - Development of a new thermally conductive injection moldable polymeric material |
| Running time: 2011 |
| Project manager: Dr. Kovács József Gábor |
12. | Fe-Group Invest Zrt. - Technological innovation of products based on polymeric waste, used in the food industry |
| Running time: 2011 |
| Project manager: Dr. Ronkay Ferenc György |
13. | Knorr-Bremse Vasúti Jármű Rendszerek Hungária Kft. - Development of a method for the qualification of cured rubber products |
| Running time: 2011 |
| Project manager: Dr. Bárány Tamás |
14. | Fe-Group Invest Zrt. - Evaluation and measurement of IV and MFI values of waste regranulated PET made after heat treatment at different temperatures and using different technological parameters |
| Running time: 2011 |
| Project manager: Dr. Ronkay Ferenc György |
15. | KONTAKT-Elektro Ipari, Kereskedelmi Kft. - Development of the material and injection molding technology of the bipolar plates of PEM hydrogen fuel cells |
| Running time: 2010-2012 |
| Project manager: Dr. Kovács József Gábor |
16. | Corvus Aircraft Sportrepülőgép Gyártó és Szolgáltató Kft. - Application of special metal alloys and novel composite elements in the development of a new generation aerobatic aircraft |
| Running time: 2010-2011 |
| Project manager: Dr. Czigány Tibor |
17. | Jász-Plasztik Kft. - Development of energy saving LED lamps and new generation solar cells |
| Running time: 2010 |
| Project manager: Dr. Kovács József Gábor |
18. | Cascade Engineering Europe Kft. - Optimization of the geometry of the ultrasonic welding of injection molded products |
| Running time: 2010 |
| Project manager: Dr. Kovács József Gábor |
19. | Jász-Plasztik Kft. - Development of the appearance and casing of new generation LCD and LED televisions; Impact study of the recycleability of PC, PMMA-ABS and PC-ABS materials |
| Running time: 2010 |
| Project manager: Dr. Kovács József Gábor |
20. | Thermofol Kft. - Development of new prepreg prototypes |
| Running time: 2009-2013 |
| Project manager: Dr. Vas László Mihály |
21. | E.ON Közép-dunántúli Gázhálózati Zrt. - Investigation of the nipple coupling of gas pipelines; analysis of the effect of operating conditions on sealing capability |
| Running time: 2009-2010 |
| Project manager: Dr. Gaál János |
22. | Cascade Engineering Europe Kft. - Welding methods of polymer structural materials; Analysis of ultrasonic welding of glass fiber-reinforced injection molded polyamide parts |
| Running time: 2009 |
| Project manager: Dr. Kovács József Gábor |
23. | Grundfos Magyarország Gyártó Kft. - Redesign of a radial ventilator considering hydrodynamic, vibration and acoustic aspects optimized for injection molding and the selection of raw materials |
| Running time: 2009-2010 |
| Project manager: Dr. Kovács József Gábor |
24. | Thomas and Betts Gyártó Kft. - Analysis of the recycleability of PC products
|
| Running time: 2009 |
| Project manager: Dr. Czigány Tibor |
25. | Jász-Plasztik Kft. - Experimental development of the geometry and material of a novel LCD television stand |
| Running time: 2009 |
| Project manager: Dr. Kovács József Gábor |
26. | Zollner Elektronik Gyártó és Szolgáltató Kft. - Development and research of the shrinking properties of injection molded products flat on one side |
| Running time: 2009 |
| Project manager: Dr. Kovács József Gábor |
27. | Zollner Elektronik Gyártó és Szolgáltató Kft. - Exploration of the causes of warpage and irregular shrinkage of fiber-reinforced injection molded products by the investigation of the segregation process |
| Running time: 2008 |
| Project manager: Dr. Kovács József Gábor |
28. | Corvus Aircraft Sportrepülőgép Gyártó és Szolgáltató Kft. - Preparing and execution of transport security innovations for the production of a prototype four-seater composite aircraft |
| Running time: 2008-2011 |
| Project manager: Dr. Czigány Tibor |
29. | Carbon Composite Kft. - Mechanical, collision and heat technology investigation of a midi-bus bodywork to facilitate the materials development of bodywork-elemets |
| Running time: 2008 |
| Project manager: Dr. Czigány Tibor |
30. | EME 2001 Műanyag- és Fémipari Kereskedelmi Kft. - Manufacturing analysis of a degradable medical implant |
| Running time: 2008-2009 |
| Project manager: Dr. Czigány Tibor |
31. | E.ON Dél-dunántúli Gázhálózati Zrt. - Analysis of the effect of the squeezing of PE gas pipelines |
| Running time: 2008-2009 |
| Project manager: Dr. Gaál János |
32. | Cascade Engineering Europe Kft. - Analysis of the effect of the processing parameters and fiber content on the properties of molding defects in molded parts |
| Running time: 2007 |
| Project manager: Dr. Kovács József Gábor |
33. | Varinex Informatikai Rt. - Development of rapid molding technology center for light metal prototypes |
| Running time: 2007-2008 |
| Project manager: Dr. Czigány Tibor |
34. | Zollner Elektronik Gyártó és Szolgáltató Kft. - Research assignments for continuous development of injection molded car parts |
| Running time: 2007 |
| Project manager: Dr. Kovács József Gábor |
35. | Cascade Engineering Europe Kft. - Comprehensive research and technology development of the measurement methods and the examination of the reducability and avoidability of the shrinkage and warpage of injection molded parts |
| Running time: 2007 |
| Project manager: Dr. Kovács József Gábor |
36. | MÁV Dunántúli Távközlési és Biztosítóberendezési Építő Kft. - Designing the connection parts of glass fiber-reinforced half-barriers: hydrodynamical, bending and mechanical analysis |
| Running time: 2006 |
| Project manager: Dr. Czigány Tibor |
37. | Thomas and Betts Gyártó Kft. - Development of cable ties |
| Running time: 2006 |
| Project manager: Dr. Czigány Tibor |
38. | Dekorsy Ipari és Kereskedelmi Kft. - Full-scale simulation and analysis of injection molded automotive parts |
| Running time: 2005-2006 |
| Project manager: Dr. Kovács József Gábor |
39. | Fővárosi Vízművek Zrt. - The estimation of lifetime of different PE 100 type HDPE pipes at increased stress levels |
| Running time: 2004 |
| Project manager: Dr. Gaál János |
40. | Zoltek Rt. - Development of a second generation carbon fiber raw material and technology for high-tech applications |
| Running time: 2002-2003 |
| Project manager: Dr. Halász Marianna |
41. | Varinex Informatikai Rt. - Development of a Rapid Tooling Technology Center based on rapid prototyping technologies |
| Running time: 2002 |
| Project manager: Dr. Czigány Tibor |
42. | Bay Zoltán Alkalmazott Kutatási Alapítvány, A.T.I. - Development of engraveable info-tablets with two or more layers |
| Running time: 2002-2005 |
| Project manager: Dr. Czigány Tibor |
43. | Weener Plastic Kft. - Reusing PET from packaging waste |
| Running time: 2002-2005 |
| Project manager: Dr. Czigány Tibor |
44. | Polinvent Kft. - The development of carbon fiber-reinforced 3P and hybrid resin pipes and their technology |
| Running time: 2000-2002 |
| Project manager: Dr. Czvikovszky Tibor |
© 2014 BME Department of Polymer Engineering - Created by: Dr. Romhány Gábor